Production line testing of BG95-m3 Module

Hi ,

I am using BG95-m3 module in my product. I am using esim. The challenge that i am facing is that the first time registration of the esim is taking 5min to 18 min. This time on the production line a big challenge.

Is there any alternate way through which i can verify my module on production line rather than waiting for 5 to 18 min to get it registered.

The above time is w.r.t MVNO

Regards
Vineet

Hi Vineet, initial registration usually spend more time and could you please check the signal with command AT+CSQ .